Power and capacity of professional solutions

Construction of Federal Testing Centre on the territory of the Russian Federation

The Belgorod Division of the Soyuzenergoproekt LLC has embarked to develop:
Of the estimate documentation;
Of the design and cost documentation;
Integration of special design process solutions from domestic and foreign partner companies into general FTC design process solutions in accordance with requirements of Russian Federation technical rules and regulations.

The project is under development on behalf of the Federal Testing Centre PJSC an affiliate of the Rosseti PJSC, in cooperation with Russian and international leading experts:

Special process aspects:

SPA Strimer JSC – Russian Federation

SPF ELNAP LLC – Russian Federation

CESI Group – Italy

Ekros-Analitika LLC – Russian Federation

Strojkompleks-5 LLC – Russian Federation, and others.

Architectural concept:

Ingmar A&CB LLC – Russian Federation

It is supposed by the project to construct 9 laboratory complexes, namely:

  • HighVoltageLaboratoryComplex;
  • HighPowerLaboratoryComplex;
  • Laboratory Complex of UHV Power Lines;
  • Laboratory Complex for Climatic Testing;
  • Laboratory Complex for Seismic and Vibration Testing;
  • Laboratory Complex for Electromagnetic Compatibility Testing;
  • Laboratory Complex for Testing on Cable Systems;
  • Laboratory Complex for Mechanical Testing;
  • Auxiliary Laboratory Complex,

Additionally, as per the project it is assumed to create a well-developed transport and engineering infrastructure as well as multifunctional administration area.