1. Adjustment of the existing project “Reconstruction of outdoor switchgear 330 kV with the installation of AT-3 on the SS 330/110/10 kV “Novokyivska “.
2. Development of technical solutions for the construction of buildings, including:
– gas insulated switchgear 330 kV (14 switches), in combined building with general substation control center;
– gas insulated switchgear 110 kV (25 switches);
– fire extinguishing pump station;
– 2 valve chambers;
– fire water supply tanks (2×160 m);
– oil collector (400 m³) and pumping station for oily effluents.
3. Development of technical solutions for the installation of 3 autotransformers 330/110 / 38.5 kV.
4. Development of technical solutions for the reconstruction of outdoor switchgear 330 kV with rebuilding of 5 OHL 330 kV.
5. Development of technical solutions for the reconstruction of outdoor switchgear 110 kV with rebuilding of 11 OHL 110 kV .
6. Development of technical solutions for the construction of new water supply, sewerage and fire water supply networks.
7. Development of technical solutions for two new artesian wells and installation of a new water tower.
8. Development of technical solutions for lightning protection and grounding of substation.
9. Execution of designer supervision during construction.
1. Development of technical solutions for the installation of AT-1 (3 phases) with disconnectors and surge suppressor on 750 kV and 330 kV site.
2. Development of technical solutions for the installation of TPR-1 (3 phases).
3. Development of technical solutions for outdoor switchgear 330 kV on 1 field (installation of 2 switches 330 kV, installation of 4 disconnectors with earthing blades 330 kV).
4. Development of technical solutions for re-construction of two OHL 330 kV with relocation of voltage transformer and HF communication (Kozyatyn OHL, Vinnytsia OHL).
5. Development of technical solutions for the installation of voltage transformer on the side of AT-1 330 kV .
6. Development of technical solutions for the installation of indoor switchgear 15.75 kV.
7. Development of technical solutions for the installation of latch chambers for AT-1.
8. Development of technical solutions for modernization of relay protection systems for the organization of protection AT-1, TPR-1, busbar 750 kV, busbar 330 kV, new field 330 kV and indoor switchgear15.75 kV.
9. Development of technical solutions for the modernization of relay protection systems for the organization of protection AT-2, TPR-2;
10. Development of automatic process control system 750 kV.
11. Development of technical solutions for the expansion of automated commercial electricity metering system upon connectionAT1.
12. Execution of designer supervision during construction.
Project of Orlivska Wind Power Plant (WPP) 100 MW (Ukraine, Zaporizhia region, 2019)
1. Design of the wind farm of Orlivska Wind Power Plant.
2. Project of administrative and household complex with control room.
3. Project of substation 150/35/10 kV
4. Project for reconstruction electric networks of NEK Ukrenergo and PJSC Zaporizhzhyaoblenergo for connection of electrical installations of Orlivska WPP .
5. Execution of designer supervision during construction.
1. Development of project documentation for the construction of 150/35 kV substation for the Dnieper-Buzka wind farm.
2. Development of architectural and construction solutions.
3. Development of electrical solutions.
4. Development of networks of water supply and sewerage, heating, air conditioning and ventilation of the administrative and household complex with a control room.
5. Development of solutions for relay protection automatics, SCADA, automated commercial electricity metering system, engineered safeguards, communication systems and automation of engineering systems.
1. Development of project documentation for the reconstruction of Substation 150/35/10 kV Posad Pokrovska.
2. Development of technical solutions for the expansion of 150 kV outdoor switchgear with the replacement of basic equipment.
3. Development of electrical solutions.
4. Development of solutions for relay protection systems, communications, telemechanics, automated commercial electricity metering system.
5. Development of technical solutions for the replacement of the existing 220 V DC board and battery.
6. Development of design documentation for cable networks.
7. Calculation of lightning protection and grounding.
8. Development of technical solutions for restructuring of overhead lines 150 kV entries at substation 150/35/10 kV Posad Pokrovska.
1. Development of design documentation for Solar Power Plant Yasenove-2 with installed capacity of photovoltaic modules up to 6.0 MW with three 35 / 0.4 kV transformer substations and a complete 35 kV switchgear in the modular building.
2. Development of technical solutions for the reconstruction of two OHL 35 kV and substation 35/10 kV with extension to one cell.
3. Development of architectural and construction solutions and master plan.
4. Development of electrical solutions.
5. Development of technical solutions for relay protection and communication systems, telemechanics, automated commercial electricity metering system
1. Design of the wind farm Tiligulskaya WPP-2.
2. Design of an administrative and household complex with a control room.
3. Design and construction of Tiligulskaya WPP-2.
4. Project works on reconstruction of electric networks of SE “NEC“ Ukrenergo ”and PJSC“ Mykolaivoblenergo ”for connection of Tiligulskaya WPP-2 to the grid
5. State examination of project documentation.
1. Development of technical solutions for the replacement of 3 shunt reactors 750 kV.
2. Development of constructive decisions on replacement of shunt reactors rolling paths and installation of new oil receivers.
3. Development of electrical solutions in terms of modernization of relay protection and monitoring system for three groups of shunt reactors.
4. Execution of commissioning works and high-voltage tests of 750 kV shunt reactors Р-1 ph. «С», Р-5 ph. «С», Р-6 ph. «С».
5. Execution of designer supervision during construction.
1. Development of engineering documentation for the construction of a new high-voltage line (OHL) 750 kV with entries OHL 330 kV.
2. Supply of equipment for secondary systems (relay protection automatics, SCADA, communications).
3. Commissioning of relay protection automatics and emergency control automatics on 750 kV site.